WELLFOR 64" x 36" Bathroom Medicine Cabinet by WELLFOR

WELLFOR 64" x 36" Bathroom Medicine Cabinet

$1,484.98
Sale price  $1,484.98 Regular price 
Skip to product information
WELLFOR 64" x 36" Bathroom Medicine Cabinet by WELLFOR
1/13

WELLFOR 64" x 36" Bathroom Medicine Cabinet

$1,484.98
Sale price  $1,484.98 Regular price 
Shipping calculated at checkout.
Description

Product Overview

Whether for studio apartments or similar needs, the WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors delivers adjustable quality and home aesthetics. Engineered using Aluminum, measuring 4.81"D x 64"W x 36"H, available in Chrome Aluminum. Notable features include product dimension and set includes, contributing to its space-saving character.

Key Features

  • Product Dimension - This set includes three mirrored cabinets — two 24"x36" and one 16"x36" — combining into a spacious 64"x36" wall-mounted unit. Wall-mount dimensions: W 64" × H 36" × D 4.81". Recessed dimensions: W 63.5" × H 35.5" × D 3.81".
  • Anodized Chrome Aluminum - Crafted from premium anodized chrome aluminum, this bathroom medicine cabinet offers a sleek look with superior rust resistance and long-term durability.
  • Blum Soft-Close Hinges - Equipped with premium Blum hinges, the soft-close door design eliminates noise and ensures a smooth, quiet closing experience, while also enhancing the overall longevity and reliability of the cabinet.
  • 180° Reversible Door Installation - Designed with a 180° reversible mirror door, this mirror cabinet allows left or right opening for flexible installation and personalized convenience.
  • Adjustable Glass Shelves - Includes 9 ultra-clear adjustable glass shelves (8mm each), each supporting up to 35 lbs. Customize the height to fit your needs and keep your bathroom essentials perfectly organized.
  • Tri-View Glass Mirrors - With tri-view glass mirrors, this aluminum medicine cabinet offers a panoramic view that simplifies your grooming routine, giving you the perfect angle for shaving, makeup, or hairstyling with ease.
  • Surface or Recessed Mount - This medicine cabinet supports wall-mounted or recessed installation and includes a surface mount kit for convenience.
  • Easy Installation - This mirror cabinet is shipped in THREE packages and requires simple assembly. All necessary hardware and a clear installation manual are included in the package, making the setup quick and hassle-free.

Why Choose the WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror

The WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror, Anodized Chrome Aluminum Frame, Surface Mount or Recessed Medicine Cabinet with Mirror, Bathroom Mirror with Storage, Three Doors demonstrates stylish engineering with practical features like product dimension, leading to modern style that holds up over time.

Best For

The WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror is best suited for: Adjustable glass shelves+Soft-close door+Reverisble Installation+Surface or Recessed Mount.

Quick Summary

The WELLFOR 64" x 36" Bathroom Medicine Cabinet with Mirror is a Medicine Cabinets product by WELLFOR. Brand: WELLFOR. Color: Chrome Aluminum. Material: Aluminum. Product Dimensions: 4.81"D x 64"W x 36"H. Special Feature: Adjustable glass shelves+Soft-close door+Reverisble Installation+Surface or Recessed Mount. Price: $1484.98.

Product Specifications

Specification Details
Brand WELLFOR
Color Chrome Aluminum
Material Aluminum
Product Dimensions 4.81"D x 64"W x 36"H
Special Feature Adjustable glass shelves+Soft-close door+Reverisble Installation+Surface or Recessed Mount
Care

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

Design

Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.

You may also like